From your drawing — or a sample we reverse-engineer — to first article in as little as 11 weeks. NDA protected, fully documented, ready for serial production.
OEM: You provide the drawing, specification or a sample. We quote tooling, validate first articles, document the FA package, and run serial production at your target volume.
ODM: You describe the application and target cost. Our 22-engineer R&D team designs the part, validates with FEA, prototypes in-house, and delivers an OE-grade solution branded for you.
Either way: full NDA, traceable manufacturing, IATF 16949 quality records, and your own private packaging if you want it.

Sign mutual NDA. Receive drawings, samples or specifications. Engineering review.
Tooling & unit cost quote with design-for-manufacturing recommendations within 5 days.
Build molds and machining fixtures. Deliver 5-20 prototype samples in 3-4 weeks.
Full dimensional + material + functional test report. Buyer approves before serial production.
Manufacturing per agreed schedule with weekly progress photos and SPC data.
Outgoing quality control with COC, FA, batch records — packed per spec.
FCL, LCL, air or rail. Customs documentation handled. Insurance arranged on request.
Lifetime engineering support, ECO management, second-source assistance if required.
Detailed 2D/3D files in your preferred format — DWG, STEP, IGES, PDF.
Material certificate, dimensional layout, hardness, tensile, all critical CpK data.
Your logo, multi-language inserts, barcodes, anti-counterfeit seals if needed.
Mutual NDA standard. Tooling owned by you on request, with secure storage logs.
Statistical process control charts shared monthly — full transparency on every lot.
REACH, RoHS, MSDS, CE — all documents tied to your part number and lot.
(Buyer names anonymised per NDA. We can share references on request and with their permission.)

Reverse-engineered from a 25-year-old service part. Delivered first article in 11 weeks; serial production at 1,800 units/month.

Designed from scratch with our R&D team. Coated skirt, custom dome. Now sold under buyer's brand in 14 US states.

27-SKU water pump catalog manufactured under buyer's private label, with custom packaging and UK-specific compliance inserts.
For heavy-duty diesel programs, use our technical specifications and RFQ checklist to prepare part references and validation requirements.
Send it under NDA. We'll respond within 3 business days with a tooling quote, lead time and a clear development plan.